Universal Structure Takeoff & Cost Intelligence

Accurate ready-mix, 1:2:4 nominal mix ratios, steel reinforcement, drywall, brick masonry & 1-page PDF bids.

Concrete & Foundation Slab Takeoff

Calculate volume, ready-mix transit mixers & rebar grid

ft
ft
in
Nominal Mix Ratio & Raw Ingredients (1.54 Dry Factor) Site Batched

Calculates exact 50kg cement bags, sand, crushed stone / bajri, and Grade 60 steel reinforcement.

1.54 Std
$
Concrete Takeoff Summary Live Calculated
Total Wet Concrete Volume (With Waste)
13.07 yd³

Equivalent to 10.0 m³ / 353 CFT

Ready-Mix Transit Trucks: 2 Trucks
Site Batched Takeoff (1.54 Factor) Ratio 1:2:4
50kg Cement Bags: 89 Bags
Sand (Rait): 222 CFT (6.3 m³)
Bajri / Aggregate: 444 CFT (12.6 m³)
Mixing Water (0.50 W/C): ~2,490 Litres
Steel Reinforcement (Sariya): 871 lbs (0.44 Tons)
Rebar Linear Length: 1,304 LF
Estimated Concrete Cost: $1,960.50